Maynard and SandHill towers are
running 100%

Maynard Tower Is
100% Operational 05/15/2009
Sandhill Tower Still
Needs Repairs done 05/18/2009 Please Try not to run Music Download
Programs for long periods. Till
I post here that is 100% Operational

Newest News
I am moved back into my house I put
servers online this weekend, any customers that get internet access
restricted call me to get your info updated due to customer routers and
computers being changed through ice storm.
Contact Numbers /
501-817-1032 / cell is 870-810-0044.

............. Notice Of
Service Up ............
Service is back up
please do not use any music or movie downloading programs all customers
have open access to bandwidth if customers use these programs before all
servers are built it will slow the internet down to a crawl I will post
on this site when normal usage can be done Thank You.

AT&T Network Engineers will be performing a planned maintenance
on St. Louis Gigabit Access Router 8. The work will be performed on
3/5/2008, during the maintenance window of 12:00AM-6:00AM, local time.
AT&T's goal is to successfully complete the task and restore service
within the stated time frame.
We apologize for any inconvenience that you may experience. Please be
assured all AT&T authorized maintenance activities are to ensure
optimal performance of our network facilities and equipment.
AT&T Network Engineers will be performing an IOS upgrade.

02/12/2008 9:00 Pm.
Maynard Tower has been repaired. It is
operating at 100%.
02/11/2008 10:57 Pm.
Maynard Tower has been hit by lightning
I am trying to resolve the issue ASAP.

AT&T Network Engineers will be performing a planned maintenance
on Memphis Gigabit Access Router 1. The work will be performed on
2/22/2008, during the maintenance window of 12:00AM-6:00AM, local time.
AT&T's goal is to successfully complete the task and restore service
within the stated time frame.
We apologize for any inconvenience that you may experience. Please be
assured all AT&T authorized maintenance activities are to ensure
optimal performance of our network facilities and equipment.
AT&T Network Engineers will be performing an IOS upgrade.

Maynard Tower Back Online 6:30pm
02/06/08
The previous system shutdown at 8:13:47
PM on 2/5/2008 was unexpected.
The severe storms that went through
last night the Tower in Maynard took a hit that damaged equipment I
replaced most equipment in the early morning hours and started to rain
when it got to the point of replacing the Access Point on the top. I
will be getting the Maynard Tower Back online ASAP.

The previous system shutdown at 3:44:56
PM on 1/29/2008 was unexpected.
The high winds in the Maynard Area near
the N.O.C. center caused extensive damage to power lines that caused a
longer normal power outage, the system was shutdown to help prevent
damage to data.

|